24 Hour Emergency Steel Machining Response

Maintenance steps of elliptical head

We supply elliptical head, butterfly head, large diameter head, spherical head, pressure vessel head, boiler head, etc. with complete specifications and models and quality assurance.

Maintenance steps of elliptical head:
1. The chloride ion content of water for hydrostatic test shall not be greater than 25mg / L, and it shall be dried in time after the test.

2. Reducing acids such as hydrochloric acid shall not be used for stainless steel pickling.

3. Strictly abide by the media compatibility specified in the volume regulations.

4. Prevent collision and scratch on the surface of stainless steel elliptical head.

5. Prevent direct contact with carbon steel and avoid iron ion pollution.

6. It shall not be stored in the open air and protected from rain.

7. Avoid forced assembly welding. The structural design shall prevent excessive restraint stress.

8. After the elliptical head and cylinder are assembled and welded, the weld, heat affected zone and surrounding welding slag, spatter and pollutants shall be cleaned in time, and PT inspection and surface pickling shall be carried out.

Are you also interested in further steel processing (machining)?

Just like you, 70% customers choose long-term cooperation with BBN steel not only for our good product and service quality, good reputation in the international market, but also for our experienced one-stop raw material supply and further steel processing!

Fabrication and Machining Service24h Technical support

Contact Us

Henan BEBON Iron&Steel co.,ltd.

Send Order Request