24 Hour Emergency Steel Machining Response
News Center
Weather Resistance Steel Plate To Inka In Indonesia

Weather Resistance Steel Plate To Inka In Indonesia

INKA is the only one railway industry fabricate the train carriage in Indonesia, we cooperated them since 2012.

4330 ton H beam to Indonesia railway station project

4330 ton H beam to Indonesia railway station project

4330 ton Grade Q345B H beam to Indonesia railway station project. products, H beam. type:weld , hot rolled technique.

266 ton stainless steel plate and pipe supplied to heat-engine plant equipment in Vietnam

266 ton stainless steel plate and pipe supplied to heat-engine plant equipment in Vietnam

products stainless steel plate, pipe
266 ton stainless steel plate and pipe supplied to heat-engine plant equipment in Vietnam

5600 ton seamless steel pipe offered to keppel in Singapore

5600 ton seamless steel pipe offered to keppel in Singapore

5600 ton seamless steel pipe offered to keppel in Singapore

 2227 ton weld H beams to Thailand

2227 ton weld H beams to Thailand

2227 ton weld H beam to 7000 square meter workshop in Thailand

4960 ton ABS EH36 steel plate to ASIMAR shipyard in Thailand

4960 ton ABS EH36 steel plate to ASIMAR shipyard in Thailand

Bebon supplied 4960 ton ABS EH36 steel plate to ASIMAR company in 2012. The plates are used to build the vessel. MTC for the products

790 ton stainless steel plates supplied to Peronas, Vietnam

790 ton stainless steel plates supplied to Peronas, Vietnam

790 ton stainless steel plate and Coil supplied to Peronas Carigali Sdn SdnProject

2950 ton A36 steel plate to Philippine water supply project

2950 ton A36 steel plate to Philippine water supply project

Bebon offered 2950 ton A36 steel plate to Philippines customer, which was used to build water supply project. It is the government project.

2300 ton API 5L GrB ERW pipe supplied to Polyard Petroleum in Philippines

2300 ton API 5L GrB ERW pipe supplied to Polyard Petroleum in Philippines

Bebon supplied 2300 ton API 5L GrB ERW pipe to Polyard Petroleum company in 2016. It takes 35 days for Bebon to finish all the production according to API 5L standard.

Shipping 230 tons Hot rolled stainless steel plate to Vietnam in 2015

Shipping 230 tons Hot rolled stainless steel plate to Vietnam in 2015

In 2012, we offered 230 ton 309S and 310S stainless steel plate to Vietnam fabrication company. The products are used in fabricating machine for this company. T

S355J2H/Q345D seamless pipe shipped to Thailand in 2015

S355J2H/Q345D seamless pipe shipped to Thailand in 2015

In November of 2015, Thailand one company contacted with us from Internet. They are find the trustable supplier of S355J2H seamless pipe for there cable car su

Shipping 175 ton Cold rolled stainless steel plate to Thailand in 2015

Shipping 175 ton Cold rolled stainless steel plate to Thailand in 2015

In 2014, we offered 175 ton Cold rolled stainless steel plate to Thailand. The products are from TISCO. Here is the MTC that we offered to customer.

Bebon hav

 49   Home Previous 2 3 4 5 Next Last