EN10225 S355G8+M Shipbuilding Steel Coil
EN10225 S355G8+M Shipbuilding Steel Coil Chemical Composition and Mechanical Property
C max | Si | Mn | P max | S max | Cr max. | Mo max. | Ni max. | Al | Cu max. | N max. | Nb max. | Ti max. | V max. | Cr+Mo+Ni+ Cu max. | Nb+V max. | Nb+V+Ti max. |
0.14 |
0.15-0.55 | 1.00-1.65 |
0.020 |
0.007 |
0.25 | 0.08 | 0.50 | 0.015-0.055 | 0.30 | 0.010 | 0.040 | 0.025 | 0.060 | 0.90 | 0.06 |
0.08 |
Yield Strength (MPa) min. (t≤16mm) | Yield Strength (MPa) min. (16<t≤25mm) | Yield Strength (MPa) min. | Elongation min. % |
355 | 355 | 470-630 | 22 |
EN10225 S355G8+M Shipbuilding Steel Coil Application
EN10225 S355G8+M shipbuilding steel coil is used for Shipbuilding Project and Offshore Structural Project.
EN10225 S355G8+M Shipbuilding Steel Coil Other Name
EN10225 S355G8+M shipbuilding steel, EN10225 S355G8+M shipbuilding steel coil
Additional Condition
UT(Ultrasonic examination), AR(As Hot Rolled only), TMCP(Thermal Mechanical Control Processing), N(Normalized), Q+T(Quenched and Tempered),Z Direction Test(Z15,Z25,Z35), Charpy V-Notch Impact Test, The Third Party Test (such as SGS Test), Coated or Shot Blasting and Painting.
Other Terms
Packaging Details: Standard export seaworthy packing or as required.
Delivery Time: 30-50 days, 7 days for stock goods.
Loading Port: Shanghai ,Tianjin, Qingdao.
Offer Ability:5 000MT/Per Month.
MOQ: 1 Pcs.
Delivery Time: 30-50 days, 7 days for stock goods.
Loading Port: Shanghai ,Tianjin, Qingdao.
Offer Ability:5 000MT/Per Month.
MOQ: 1 Pcs.
Sales Department Team
Send Order Request Online Chat