DIN 17102 WStE285 Carbon and Low-alloy High-strength Steel Coil
DIN 17102 WStE285 Carbon and Low-alloy High-strength Steel Coil Chemical Composition and Mechanical Property
C max |
Si max. |
Mn |
P max |
S max |
N max. |
All tot 1) |
Cr max |
Cu max |
Mo max |
Ni max |
Nb max |
Ti max |
V max |
Nb+Ti+V max |
0.18 |
0.40 |
0.60-1.40 |
0.035 |
0.030 |
0.020 |
0.020 |
0.30 |
0.20 |
0.08 |
0.30 |
0.03 |
- |
- |
0.05 |
1) If nitrogen is additionally controlled by niobium, titanium or vanadim, the specification minimum aluminium content is dropped.
Yield Strength (MPa) min. (t≤16mm) | Yield Strength (MPa) min.(16mm<t≤25.4mm) | Tensile Strength (MPa) | Elongation % min. |
285 | 276 | 390-510 | 24 |
DIN 17102 WStE285 Carbon and Low-alloy High-strength Steel Coil Application
WStE285 carbon steel coil is used in the Construction of Bridges, Highway Construction and Other Engineering construction.
DIN 17102 WStE285 Carbon and Low-alloy High-strength Steel Coil Other Name
DIN 17102 WStE285 structural steel, WStE285 carbon steel coil, WStE285 structural steel coil
Additional Condition
UT(Ultrasonic examination), AR(As Hot Rolled only), TMCP(Thermal Mechanical Control Processing), N(Normalized), Q+T(Quenched and Tempered),Z Direction Test(Z15,Z25,Z35), Charpy V-Notch Impact Test, The Third Party Test (such as SGS Test), Coated or Shot Blasting and Painting.
Other Terms
Packaging Details: Standard export seaworthy packing or as required.
Delivery Time: 30-50 days, 7 days for stock goods.
Loading Port: Shanghai ,Tianjin, Qingdao.
Offer Ability:5 000MT/Per Month.
MOQ: 1 Pcs.
Delivery Time: 30-50 days, 7 days for stock goods.
Loading Port: Shanghai ,Tianjin, Qingdao.
Offer Ability:5 000MT/Per Month.
MOQ: 1 Pcs.
Sales Department Team
Send Order Request Online Chat